Skip to content

February 2019

Initial track laying

Now the boards have been prepared, it’s finally time to start laying track! I’ll be using Peco code 75 for this project, with the following modifications: I’ll be re-spacing the sleepers to look more prototypical. I’ve recently seen this done on the excellent Everard Junction… Read More »Initial track laying

Joining the boards

Before track laying and wiring can begin, I need a simple, reliable and repeatable way of joining the two baseboards. The baseboard dowels I have already fitted take care of their alignment when butted up against one another, but I need a way to ensure… Read More »Joining the boards